86exporter.com Home       Products Catalog      Suppliers Catalog      Log In        Sign up
      About Us
      Profile
      Products
      Contact Us


Anping No.1 Welded Mesh Factory

Products >> 3D panel wall structure and 3D panel wall system c

3D panel wall structure and 3D panel wall system c

Build Your Online Product Catalogs?



Description
Product Name: 3D panel wall structure and 3D panel wall system c
Supply Ability:
Related proudcts
Specifications 3D wire Panels, double layer welded panel
Price Term:
Port of loading:
Minimum Order
Unit Price:

3D panel structure and construction

3D Panel Wall Structure

Foamed polystyrene insulating layer with the thickness of 100m/m in the center, steel wire truss coated with zinc of 3 m/m (3.8 mm) between the insulating layer is pinned at 2 intervals, at both sides of which forms up at 5 Cm X 5 Cm (5 Cm X 10 Cm) intervals with the wire mesh coated with zinc of 3 m/m (3.8mm) that is at fine-spun 50 m (100 m) intervals. So the whole points of contact in all steel wires is joined in a spot welding, which is a panel of 2.4 m (4 m) full length, 1.2 m width, 60~200 m/m thickness.

At the first time, it will be sprayed or hand plastered on the both sides in a thickness of 7 m/m ~10 m/m, and finished with first coat and double second coat of 35 m/m ~ 30 m/m thickness, which produces the structure with the total thickness of 12 Cm ~ 13 Cm, the self-load of 120 kg/m2, and the strong earthquake proofing.

Construction of 3D Panel Wall System

1. After setting up the fixed metallic materials upon the foundation concrete, the panel is to be in- between stabilized.
2. Tie up the connecting line of #22, every kind of strengthened mesh between concrete and panel, panel and panel.
3. Lay under the ground the essential electrical pipes and all types of arrangements pipe.
4. Finish with the examination to the assemblage, horizontality and verticality, reinforcement and pipe arrangement status.
5. Finish the global body with the first time mechanism of spraying cement mortar, and with the second time hand plastering of skimming coating.
6. It can be finalized with every type of materials in correspondence to its usage like pitching, tiling, marbling, paper hanging, painting etc.
7. If used for more than second floor building, the construction procedure is like this: 1 assemble the lower part wall, 2 lay down the foundation concrete, 3 assemble the upper part wall, 4 mechanical plastering on the lower part, 5 spraying after laying down the foundation concrete on the upper part.

Contact Us
Company: Anping No.1 Welded Mesh Factory
Contact: Mr. hui zhang
Address: 10 Chengming Street, Hengshui, Hebei, China.
Postcode: 053600
Tel: 8631857865437
Fax: 8631857865437
E-mail:         


Copyright© Anping No.1 Welded Mesh Factory All Rights Reserved.
Tel : 8631857865437 Fax : 8631857865437
Powered by 86exporter.com